Main steel frame
|
H section steel beam and columns, painted or galvanized, galvanized C/Z section or steel pipe
|
Secondary frame
|
Hot dip galvanized C/Z section purlin , steel bracing , tie bar , knee brace , edge cover, pull bar sleeve
|
Roof panel
|
EPS sandwich panel,glass fiber sandwich panel,rock wool sandwich panel,and PU sandwich panel or steel sheet
|
Wall panel
|
Sandwich Panel or Corrugated Steel Sheet(PPGI)
|
Knee Brace
|
Angle Steel
|
Roof Gutter
|
Color Steel Sheet
|
Tie Rod
|
Circular Steel Tube
|
FAQ
Q1: Are you manufacture factory or trading company?
A1: We are direct manufacture factory, located in Qingdao, china,very close to Qingdao portWe have strictly quality management system, professional design team,strong productioncapacity and rich manufacturing experience.
Q2: How about your quality control?
A2:1) We only cooperate with high-quality raw material suppliers with strength and reputation,andour quality inspection department will conduct 10o% strict testing on the raw materials beforeentering our factory.
2) Our workers are all certified and regularly assessed, in this way, we can guarantee theproduction quality.
2) Our workers are all certified and regularly assessed, in this way, we can guarantee theproduction quality.
3) During the production process, we have three parts: self inspection, mutual inspection, andworkshop inspection. Only qualified product can move to next step.
4) Before delivery, inspection working will check everything with delivery list, to ensure that wesend you every items and you can install it locally.
Q3: How to get a fast quotation?
A3: Please send us your project preliminary drawing, then we would quote you accordingly in2 days. Or we confirm several questions with you, then do quotation list with details for youtimely.
Q4: Do you offer service for installation?
A4:Yes, but we will provide very detailed installation drawings and videos. Generally, you caninstall it locally, they are all prefabricated and bolted. Otherwise, we can also send engineer foguiding installation.
Q5: Do you accept container loading inspection?
A5: Yes, welcome anytime, we can also assist you to do SGS inspection.
Q6: What’s the delivery time?
A6: Usually 30 days. Don’t worry about the delivery time at all, we have perfect managementplan for each project, then deliver to you on time.
Q7: What’s the payment term?
A7: We have two payment terms: 1) 30% advance payment before producing by T/T,and 70% balance by T/T before shipping. 2)100% irrevoable L/C.
Q8:Is your price competitive compared with other companies?
A8: We are direct factory, yes, it’s competitive,price and quality are guaranteed.
Valoraciones
No hay valoraciones aún.